Gordon Drive Improvement Project

Updated: October 2018

Castle Rock Water is planning infrastructure improvements along Gordon Drive to address stormwater flows and minimize street flooding. In order to construct the storm sewer system within the existing right of way, modifications to the existing sanitary sewer and water line infrastructure are needed.

The Public Works Department has scheduled proposed improvements that include reconstruction of Gordon Drive between Johnson Drive and Gordon lane. Some adjacent streets may receive an asphalt overlay.  

Right of way and easement limit verification has been completed, and final design of the following improvements are underway:

  • Reconstruction of pavement from an inverted crown to a standard crown with catch curb and gutter, including replacement of the existing sidewalk
  • Installation of "100-year event" storm sewer system along with inlet and outlet structures
  • Modifications to and / or replacements of existing sanitary sewer and water line infrastructure

Construction of the Gordon Drive Improvement Project is scheduled for 2019 and is estimated to take about four months to complete.

Residents will receive additional updates prior to construction. An open house will be scheduled to discuss street access to homes and disruptions in water service.

For additional information, call the Stormwater Hotline at 720-733-2235, or email us.